The labeled cement is mixed with appropriate amount of water and poured into the mould.
Wait an hour to release the mould.
Six hollow bricks can be produced at a time.
The labeled cement is mixed with appropriate amount of water and poured into the mould.
Wait an hour to release the mould.
Six hollow bricks can be produced at a time.